
Dapcor completed the replacement of 550 m² of combustible cladding with a compliant non-combustible cladding system, improving the building’s fire safety, durability and external appearance in Camperdown.
The project involved the careful removal and disposal of the existing combustible facade materials, followed by surface preparation and installation of the new cladding in accordance with manufacturer requirements, current fire safety standards and environmental regulations.
Strict safety procedures and quality inspections were maintained throughout the works to confirm correct installation, alignment, fixing and sealing. A final inspection verified that the completed facade cladding replacement met the required compliance and fire protection standards, providing the building with a safer and more durable external cladding solution.
